Pflugerville ISD Adaptive Reuse Feasibility Study

Pflugerville, Texas

Brief

Overview

We were engaged to provide a study to assess the adaptive reuse of Calvary Church for the district use. We assembled a team to investigate the facility and assess its fitness for future use. Some concerns in the community about the foundation led to a more exhaustive investigation that revealed it to be sound. A conceptual plan was developed based on district input that included phasing of the work to add a second story to the building. The phasing plan worked around the church's continued use of the facility over the next year and immediate needs versus the future needs. A budget was provided per each phase with inflation associated for when the work would be initiated. The final product was a 400 plus page feasibility study that was instrumental in the purchase of the property.

Project

Details

Owner:
Pflugerville Independent School District
Completion:
May 2021
Services Provided:
• Feasibility Study
• Detailed Foundation Investigation
• Conceptual Plan with Phasing
• Budgeting
• Phase 1 Environmental Site Analysis
Key Personnel:
Antonio Naylor, AIA, ALEP
Design Consultants:
• Gil Engineering Associates
• LOC Structural Division
• Arnold Investigative Group
• Hendrix Consulting Engineer
• Rock Engineering
• Melody Cornelius